Project: RANS21RB   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Randall Brooks   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1990
Total Flight Time:
Start/Last Date:Apr 03, 2021 - No Finish Date
Engine:Titan IO-340 180HP
Propeller:Whirlwind
 
Friendly URL: https://eaabuilderslog.org?s=RANS21RB

Home or Last Project Picture

Jun 04, 2021     Wing Build-Up - (3.8 hours)       Category: Wings
Installed serrated liner in ribs 1-3. Installed aileron cables and flap teleflex cable. Safety wired both cables. Installed rubber grommets for wire runs. Ran pitot and AOA tubing to pitot location. Riveted ribs to front and rear spars. Left out middle rivets in rear spar that will be used for gap seals.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.